CASE STUDIES
Take a look at some of our past projects below. By utilizing a range of structural solutions, our dedicated team brings innovative solutions to even the toughest of problems.
OLIN LIBRARY
FRP reinforcement was needed to strengthen areas identified by Streeter Associates. FRP was identified as the best solution for this reinforcement, for it's minimal footprint on the jobsite and for the strength that it provides, without additional beams or structural solutions being added to the existing structure.
41ST AVE
After performing site visit to inspect the elements and access, Coordinated Systems Consulting (CSC) developed a proprietary solution to protect, repair and strengthen two structural beams in accordance with agreed upon scope of work.
KRESSEN STREET
The existing structure has fallen into disrepair and requires numerous concrete repairs, joint sealant replacement, composite strengthening and numerous other miscellaneous repair items. Coordinated Systems Consulting outlined FRP composite strengthening for the pre-cast tees in flexure as well as shear reinforcing as noted on the plans.
NATIONAL AIR AND SPACE MUSEUM
On January 21st, 2019, Carla Ramo referred Mr. Tim Mehall to Coordinated Systems Consulting to design, furnish, and install Carbon Fiber Reinforced Polymer required by the National Air and Space Museum West Terrace Revitalization. The repair details for the revitalization project describe the reinforcement requirements for 12 columns.
BROOKWOOD SECURE CENTER
Based on the loading requirements, measurements, details, and notes provided throughout the detailed drawings, CSC (with engineering support from FYFE Company) developed an engineered solution for the use of TYFO Fiber Reinforced Polymer Composite Systems for approximately 7 beams.
BUCKS COUNTY PARKING GARAGE
The existing structure has fallen into disrepair and requires numerous concrete repairs, joint sealant replacement, composite strengthening and numerous other miscellaneous repair items. Coordinated Systems Consulting outlined FRP composite strengthening for the pre-cast tees in flexure as well as shear reinforcing as noted on the plans.
130 IRVING PLACE
Coordinated Systems Consulting was approached by One70 Group with a full rehabilitation project consisting of a multi level concrete slab structure being renovated for a client located in Woodmere NY. A survey of the slab was conducted and it was determined to be a post tensioned slab.
MARKLEY LOWELL
The existing building was once the Prince® Spaghetti factory, consisting of roughly three floors of open span space with thirty-foot ceilings. The Markley Group’s design for this building required the structure to be upgraded for seismic and additional strengthening above and beyond its originally intended design.
CAMBRIDGE VIADUCT
In 2019, CSC was contacted by SPS New England, Inc. to provide Carbon Fiber Reinforcement to the arches and floor beams supporting the East Cambridge Viaduct bridge to supply additional load capacity to the existing structure. The work consisted of surface preparing the structures, CFRP installation, anchors installation, and acrylic painting.
DUELING DINOS
Application of a strengthening material was needed on several beams in the North Carolina Museum of Natural Sciences. CSC partnered with Brawley Company as our general contractor on this project. FRP wrapping was determined to be the most cost efficient and structural effective solution for this job.
LOGAN CORRECTIONAL
A partnership between CSC, Surtreat, and Fyfe FRP, completed a significant structural remediation project at Logan Correctional Facility's Housing Unit 9. The project addressed severe deterioration from aging, including corroded rebar and concrete defects. Solutions included corrosion inhibition treatments, concrete repair, and FRP reinforcement.